Ruzizi III Hydropower Project

Project Description
PIA provided technical assistance and optimality analysis for the development a hydro dam located on the Ruzizi river, a resource shared between the Democratic Republic of the Congo, Rwanda and Burundi. The economic analysis conducted compared costs and benefits, for a range of project options, to decide upon optimal installed capacity and soundness of project.
Project Details
| Geography | Rwanda, DRC & Burundi |
| Client | Ruzizi Energy Limited – Scatec |
| Date | January 2021 – April 2022 |
Delivered Results
- Economic Optimization Study Report
- Economic Analysis
- Economic Integration Report
